Ledcor
Partner since 2000
Original Challenges:
- Design build and retrofit concerns
- Renovation challenges based on tenant improvements versus original design
- Pressurization concerns throughout the building
Nordic Solutions:
- Provided a heat pump designed solution to help with new layout of building
- Installed high efficient VFDs to help with pressurization of the building
- Implemented a comprehensive customized service solution.
Impact to Bottom Line:
- Dramatically improved the temperature control system in the facility
- Lowered financial exposure to aging infrastructure with the changing demands of the building
- Provided tremendous energy and operational savings